Akkodis — R&D Engineering · 2023
Cutting the time spent checking engineering deliverables
Automated verification of engineering deliverables and Power BI tracking of performance KPIs.

control time
referenced parts checked
product lines tracked in real time
The challenge
Deliverable compliance checks were done by hand, part by part. Slow and error-prone, they delayed deliveries and gave no visibility on overall performance.
The approach
- 1Formalised the control rules with engineering teams.
- 2Built automatic verification tools in VBA and Python.
- 3Implemented OTD (on-time delivery) and FTR (first-time right) KPIs.
- 4Power BI dashboards to track each product line.
Solution architecture
Input
Engineering deliverables and part references
Checks
Automated compliance rules (VBA, Python)
KPIs
OTD and FTR computation
Steering
Power BI dashboards per product line
The results
- About 40% less control time across 60+ referenced parts.
- Real-time visibility on the performance of 3 product lines.
- Consistent, traceable checks.
What this project shows
“Automating a control saves time and makes the process more reliable — each reinforces the other.”
These projects were led by Datasium's founder during assignments and internships before the firm was founded. Figures are those observed at the end of each assignment.